Peckham Coatings
  • Home
  • Our Work
  • Services
    • Floor Coating Systems >
      • Epoxy & Urethane Coatings
      • Decorative Quartz & Flake Systems
      • Polished Concrete
      • Urethane Cement (Heavy-Duty Use)
      • Moisture Mitigation Systems
      • Static Control (ESD) Flooring
      • Anti-Slip Finishes
    • Wall & Vertical Surface Coatings >
      • Seamless Epoxy Wall Coatings
      • Fiber-Reinforced Coatings
      • Impact & Abrasion Resistant Wall Systems
    • Roof Coatings >
      • Compare Roof Coating Systems (Overview)
      • Urethane Roof Coatings
      • Silicone Roof Coatings
      • Acrylic Roof Coatings
    • Wastewater System Coatings
  • Your Industry
    • Aerospace
    • Breweries
    • Commercial
    • Dairy
    • Education
    • Food & Beverage
    • Healthcare Industry
    • Pharmaceutical & Biotech
    • Retail
    • Wineries
  • Contact

Clarifier Coating System Replacement

Location: Idaho Wastewater Treatment Plant (WWTP)
Scope: Clarifier Liner Removal and Replacement
System: MortarClad Base | Permashield Base & Topcoat – Chemical & Abrasion Resistant

Peckham Coatings was contracted to remove and replace the liner system in a clarifier at an active wastewater treatment facility in Idaho. The existing coatings were completely removed down to bare concrete through full mechanical surface preparation. We then installed a new high-performance liner system designed specifically for long-term wastewater immersion and chemical resistance.

The system began with a MortarClad base layer, providing a strong, resurfaced foundation for the coating system. Over this, we applied a Permashield base coat engineered for wastewater immersion, followed by a Permashield topcoat to deliver maximum chemical resistance, abrasion protection, and long-term durability.

The project featured a strict 28-day completion window during the plant’s scheduled shutdown. Despite challenging conditions—including extreme temperatures, high winds, heavy rain, and working around-the-clock shifts—we completed the project on time and within the required specifications. Multiple crews worked in rotation to maintain continuous progress, ensuring 24-hour coverage on-site throughout the shutdown period.

Our team coordinated closely with the facility to meet all access, safety, and production requirements. The successful execution of this project under tight timelines and extreme conditions demonstrates our ability to deliver reliable, high-performance coating systems—no matter the environment.

Home

Your Industry

Services

Contact

Employee Portal

Picture

Terms & Conditions
Privacy Policy
CSLB# 1062493
  • Home
  • Our Work
  • Services
    • Floor Coating Systems >
      • Epoxy & Urethane Coatings
      • Decorative Quartz & Flake Systems
      • Polished Concrete
      • Urethane Cement (Heavy-Duty Use)
      • Moisture Mitigation Systems
      • Static Control (ESD) Flooring
      • Anti-Slip Finishes
    • Wall & Vertical Surface Coatings >
      • Seamless Epoxy Wall Coatings
      • Fiber-Reinforced Coatings
      • Impact & Abrasion Resistant Wall Systems
    • Roof Coatings >
      • Compare Roof Coating Systems (Overview)
      • Urethane Roof Coatings
      • Silicone Roof Coatings
      • Acrylic Roof Coatings
    • Wastewater System Coatings
  • Your Industry
    • Aerospace
    • Breweries
    • Commercial
    • Dairy
    • Education
    • Food & Beverage
    • Healthcare Industry
    • Pharmaceutical & Biotech
    • Retail
    • Wineries
  • Contact