ESD Flooring Installation – Flavor Manufacturing Facility
Location: Utah
Scope: Electrostatic Dissipative (ESD) Flooring System Installation
System: ¼" Urethane Cement Base | ESD Epoxy Topcoat | Fiber-Reinforced Epoxy Cove
Peckham Coatings was contracted to replace a deteriorating floor at a flavor manufacturing facility in Utah. The existing surface showed significant wear and cracking, requiring full removal down to bare concrete. Our team implemented a durable, electrostatic dissipative (ESD) flooring system designed to meet the client’s performance and safety needs.
Surface preparation included thorough mechanical grinding, crack chasing, and epoxy patching to restore a stable substrate. We then installed a ¼-inch urethane cement base to provide strength, chemical resistance, and moisture mitigation, followed by a high-performance ESD epoxy topcoat. To complete the system, we installed integral fiber-reinforced epoxy cove base around the perimeter, ensuring seamless protection up the walls.
The work was completed during a tightly scheduled 10-day Thanksgiving shutdown, with zero disruption to the facility’s production schedule. The project was delivered on time, and the client was highly satisfied with the results—both in performance and finish.
Location: Utah
Scope: Electrostatic Dissipative (ESD) Flooring System Installation
System: ¼" Urethane Cement Base | ESD Epoxy Topcoat | Fiber-Reinforced Epoxy Cove
Peckham Coatings was contracted to replace a deteriorating floor at a flavor manufacturing facility in Utah. The existing surface showed significant wear and cracking, requiring full removal down to bare concrete. Our team implemented a durable, electrostatic dissipative (ESD) flooring system designed to meet the client’s performance and safety needs.
Surface preparation included thorough mechanical grinding, crack chasing, and epoxy patching to restore a stable substrate. We then installed a ¼-inch urethane cement base to provide strength, chemical resistance, and moisture mitigation, followed by a high-performance ESD epoxy topcoat. To complete the system, we installed integral fiber-reinforced epoxy cove base around the perimeter, ensuring seamless protection up the walls.
The work was completed during a tightly scheduled 10-day Thanksgiving shutdown, with zero disruption to the facility’s production schedule. The project was delivered on time, and the client was highly satisfied with the results—both in performance and finish.